Quality control |
|
 |
 |
 |
 |
 |
 |
 |
|
 |
|
Quality control
Each workshop is equipped for the routine control
of processing and of the production cycle.
Equipment and instrumentation for controls during
manufacturing, are calibrated according to the
rules of ISO 9000 and ASME codes.
Manpower
The Ormis Group, makes use of its own skilled per-
sonnel, well trained and with specific experience in
each workshop.
The total amount of workable hour for year by
own personnel is about 250.000.
The Companies have the flexibility to work on
three shifts, using selected temporary labour ,
which is supplied by more companies with which
there has been a consolidated relationship for
many years.
Therefor the maximum operative capacity of the
Group, using its structures reaches 500.000 hours-
years.
|
|

|
|
 |
|
 |
|
|